This project will improve the I-64/I-464 interchange by providing a direct connection between I-64 eastbound and Route 168 southbound via I-464 southbound.
This project consists of work associated with Monongahela River Locks and Dam no. 3 (also called Elizabeth Locks and Dams) demolition, establishment of the new navigable channel and stabilization of the monoliths to remain after construction.
This project transformed Coliseum Lake into a stormwater treatment facility for a 362-acre watershed.
The Ft. Eustis Bridge, the entrance to Joint Base Langley-Eustis, was widened during its reconstruction to provide better access.
This project extended the Martin Luther King Expressway to provide a shorter, more direct route to the Downtown Tunnel from Portsmouth.
This project involved the construction of a new major arterial connector across sensitive wetlands to relieve traffic congestion and widen outside travel lanes.
This design-build project replaced the structurally deficient Darden Memorial Bridge on Meherrin Road (Route 35).